Greenwich High School
Greenwich, CT
In 2016 CTC Building Solutions was selected to provide a critical temperature and building control system for the Greenwich High School. The approximately 460,000 square foot facility, was previously controlled by multiple controls systems including pneumatics and 3 different DDC control manufacturers from different addition and renovation projects over the years. The Greenwich Public Schools staff had a very difficult task of monitoring and controlling this building with so many different interfaces.
CTC installed a Distech Controls EC-Net Niagara4 supervisor central server as well as field controllers at the various pieces of equipment. The system features three (3) Niagara4 Network Managers performing network management and system integration throughout the facility.